Diesel generator set maintenance time:
1. When you are doing generator set maintenance, pay attention to the relative position and sequence of the detachable parts (marks should be made if necessary), the structural characteristics of the parts that cannot be removed, and the strength of the force when reinstalling (using a torque wrench).
2. The maintenance cycle of the air filter is performed every 50 hours.
3. The maintenance and repair cycle of the battery is performed once every 50 hours.
4. The maintenance cycle of the belt is performed once every 100 hours.
5. The maintenance cycle of the radiator is once every 200 hours.
6. Lubricating oil system maintenance and repair cycle is performed once every 200 hours.
7. Maintenance of the diesel filter is performed periodically for every 200 hours of operation. Remove the diesel filter, replace it with a new one, fill it up with new clean diesel, and replace it.
8. The maintenance and repair cycle of the charging generator and the starting motor is performed once every 600 hours.
9. The maintenance and repair cycle of the generator control panel is performed once every six months. Use compressed air to remove dust from inside, tighten the terminals, and handle and tighten the rusted or overheated terminals.
Contact: Jack
Phone: 0086-19906045242
Tel: 0086-592-7161550
Email: sales@aotchina.com
Add: No.21 Yufu Road, Jimei Disctrict, Xiamen City, China 361000