Diesel generator sets must be operated by personnel who are familiar with the structure of the unit and have mastered the safe operating procedures. New or newly overhauled diesel units should be run for 50 hours as required and maintained as necessary. For new or long-term unused generators, before they are put into normal operation, they must undergo strict inspections, mainly check the winding insulation and wiring conditions. If there is any discrepancy, perform necessary treatment.
After the diesel engine is started, the speed should be gradually increased. After checking that all the conditions are intact, the no-load operation from low speed to rated speed can be performed. During no-load operation, focus on checking the oil pressure, whether there is abnormal noise, excitation current, three-phase voltage change, etc. If there is any abnormality - stop immediately and check. After finding out the situation, start again. If everything is ok, you can put it into normal operation. The operator should closely monitor the changes of the instrument on the control panel, whether it is within the scope of the license, and make corresponding adjustments.
During operation, the operator should keep a safe distance from the live equipment and wear the labor protection equipment. The switching operation should pay attention to the sequence. If the power is cut off, the branch switches should be disconnected first, then the main switch should be disconnected, and then the four-pole double-throwing switch should be switched. When power is supplied, the order is reversed. For normal shutdown, the partial load should be removed first, then the main switch should be disconnected, and the diesel engine should be shut down. It is not allowed to pull off the main switch, and the diesel engine will be powered off automatically if it is turned off. After the shutdown, the unit is routinely inspected and the operation status (work diary) is recorded.
In the event of an electric shock, the power switch should be turned off quickly or the power supply should be quickly disconnected or disconnected from the power supply. Then rescue and ask the doctor to come to the scene to rescue. In the event of a flood of electrical equipment, the power supply should be cut off immediately and reported to the local power supply station for fire fighting. Dry fire extinguishers, carbon dioxide fire extinguishers, etc. should be used for fire fighting of live equipment, and water is not allowed.
XIAMEN AOT ELECTRONICS TECHNOLOGY CO.,LTD which can provide full kinds of generator spare parts for engine replacement. Welcome to contact us for more information.
Contact: Ms.Lika (Sales)
Email / Skype: sales@aotchina.com
Phone / Whatsapp/ Wechat: +86 159 8080 8150
Web: www.aotchina.com
Contact: Jack
Phone: 0086-19906045242
Tel: 0086-592-7161550
Email: sales@aotchina.com
Add: No.21 Yufu Road, Jimei Disctrict, Xiamen City, China 361000