Answer:
1) Verify the true useful power of the unit. Then determine the economic power, and the standby power. The method for verifying the true useful power of the unit is: a 12-hour rated power of the diesel engine multiplied by 0.9 to obtain a data (kw). If the rated power of the generator is less than or equal to the data, the rated power of the generator is determined as the true useful power of the unit. If the generator rated power is greater than this data, this data must be used as the actual useful power of the unit.

2) Verify which types of self-protection functions the unit has.

3) Verify that the power wiring of the unit is qualified, whether the protection grounding is reliable, and whether the three-phase load is basically balanced.

XIAMEN AOT ELECTRONICS TECHNOLOGY CO.,LTD which has 15 years experience in diesel generator spare parts manufacturing. We provide full kinds of generator spare parts for engine replacement and other related electric products such as automatic transfer switch, electric Relay etc. Welcome to contact us for more information.

Contact: Ms.Lika (Sales)
Email / Skype: sales@aotchina.com
Phone/WhatsApp/ Wechat: 0086 15980808150
Web: www.aotchina.com

CONTACT US

Contact: Jack

Phone: 0086-19906045242

Tel: 0086-592-7161550

Email: sales@aotchina.com

Add: No.21 Yufu Road, Jimei Disctrict, Xiamen City, China 361000

Scan the qr codeClose
the qr code